 |
CASE STUDY: Manchester City Council Leisure - Sports Development Unit, Manchester
Details
- Principal Contractor
- Completed August 2002
- Denmark Road, Manchester
- Turnkey installation of 2,343 sq metre football pitch
- Supplied with a 55mm fibrillated grass fibre with all rubber infill
- Configured for three small sided and one 9-a-side football pitch
- Surrounded by 208 linear metres of 3.6m fencing including phelonic rebound board system, with an additional 2.4m retaining netting. The system also includes a bespoke removable board pitch dividing system
- Additional lighting consisting of 4 No. Floodlight columns were added to the existing system
|