CASE STUDY: Caistor Grammar School - Lincolnshire
Details
- Principal Contractor
- Completed January 2006
- Caistor, Lincolnshire
- A full turnkey construction of a 2,400 Sq Metre Multi Use Games Area
- Supplied with Italgreen 27C (25mm) sand filled synthetic grass
- Configured for Hockey and Football, consisting of three small sided and one 60x 40m pitch
- Surrounded by 200 linear metres of 5m high galvanised Multisport fence system with multimesh rebound facility. The system includes bespoke recessed goal areas and removable pitch dividing rebound panels
- Lighting consists of 6 No. 10 metre high raise and lower low pollution floodlight system
- Car Park extension, perimeter pathways and soft landscaping completed the project
|